V R Global New Completed Projects

  • Project : 48.2 m and 54.190 m Effective Span Composite Girder
  • Scope : Road Over Bridge from Thuravoor Thekku Section of NH-66 (From Km. 366+330 to Km. 379+082)
  • Total Length : 12.752 km
  • Under : Bharatmala Pariyojana, State of Kerala (EPC Mode)
  • Authority : National Highways Authority of India

    Drawing Numbers:

  • ABL-AT-371+706-VD-226-551 to 557
  • ABL-AT-371+706-VD-226-561 to 567
  • Contractor: Ashoka Buildcon Limited

  • Work Of: Eastern Railway
  • Project: 6 x 37.2 M Span Non-Standard Composite Girder
  • Total Length : 12.752 km
  • Scope: xConstruction of ROB at Km 204 of NH-114A at Patharia (LC No. 4SPL/E) in the State of Jharkhand on EPC mode for the Year 2020-21.

  • Work: South Eastern Railway
  • Project: Bow String Girder 2 × 60 M Clear Span
  • Drawing No : RDSO/B-10434
  • Location: LC Gate No. 3, Shalimar Station, West Bengal

Project Video.